Barndominium Builders in Richardson, TX
Richardson is 28.6 square miles of finished city. Its population fell from 119,319 in 2020 to 118,542 in 2025, and its largest-lot residential district, R-2000-M, sets a minimum lot of 14,000 square feet - about a third of an acre. The Comprehensive Zoning Ordinance of 1956 contains no agricultural district and no estate district at all. So a barndominium on acreage is not a Richardson project, and we would rather say so than pretend otherwise. What does happen here is a rebuild on a platted lot, or a detached accessory building, and Richardson regulates both closely: all detached structures together may cover only 8 percent of the lot, every wall above 150 square feet needs 35 percent masonry, and every foundation needs a Texas-registered engineer's seal. For land, look north and east - the outer edge of Collin County, then Grayson, Hunt or Kaufman.
Richardson at a glance
- County
- Dallas County
- Population
- 118,542
- Where we build
- Richardson, Dallas, Irving, Garland, Grand Prairie
- Site visits
- Site walks scheduled throughout Richardson and Dallas County
ZIPs 75080, 75081, 75082
Building conditions in Richardson
What actually changes from one Texas jurisdiction to the next: who issues the permit, whether the residential code is enforced there at all, what the structure has to be engineered to, and what the ground is like. These are the numbers your drawings have to satisfy.
City of Richardson Code of Ordinances, Appendix A, Comprehensive Zoning Ordinance of 1956, Art. IV-A s. 4(a) and Art. IV s. 4(a)
City of Richardson Code of Ordinances, Appendix A, Comprehensive Zoning Ordinance of 1956, Art. IV s. 4(d)(2)
City of Richardson Code of Ordinances, Appendix A, Comprehensive Zoning Ordinance of 1956, Art. IV s. 2(b)(2)
City of Richardson Code of Ordinances s. 6-31, amending the 2021 International Residential Code
City of Richardson Code of Ordinances ss. 6-27, 6-30 and 6-33, and s. 6-31 (Chapter 11 deletion)
U.S. Census Bureau Vintage 2025 sub-county population estimates and the 2024 Census Gazetteer place file for Texas
Also worth knowing before you build in Richardson
- Permits start at 40 square feet
- Richardson cut the IRC's own permit exemption for a one-story detached accessory building from 200 square feet down to 40. The city's building inspection page states it plainly: "A building permit is required for all structures over 40 sq. ft." Anything over 150 square feet needs scaled drawings with the application.
- Accessory building height and storeys
- Accessory buildings are limited to one storey. Those of 150 square feet or less may not exceed 12 feet in height; those over 150 square feet may not exceed 25 feet. A two-storey shop-with-living-space is not permitted as an accessory building.
- Where a detached building may sit
- A detached garage, carport or accessory building extending into the rear setback must keep at least 3 feet from the side lot line and 3 feet from the rear lot line, or 18 inches where the rear lot line adjoins an alley. The city's own handout adds 7 feet from a side property line unless the building sits entirely within the rear 25 feet of the lot, and 20 feet where the side adjoins a street.
- Design criteria the city publishes itself
- Richardson's amended Table R301.2(1) gives 115 mph 3-second-gust wind (76 mph fastest mile), 5 lb/ft2 ground snow, seismic design category A, moderate weathering, a 6-inch frost line, a 22 degree F winter design temperature and a mean annual temperature of 64.9 degrees F. Termite pressure is published as "Very Heavy," which is the value that rules out foam plastic below grade at the foundation.
- Contractors register before the permit issues
- "Contractors performing work within City of Richardson are required to register prior to issuance of permit. The registration fee is $100." Registration certificates are valid for one year from the date of registration. Texas issues no state licence for a residential builder, so a city registration list is the only register there is.
- What Richardson deleted from the code
- Local Government Code s. 214.212(c)(1) lets a Texas city add, modify or remove code requirements, and Richardson has used all three. IRC R313, automatic sprinkler systems, is "hereby deleted and is of no force or effect," and so is R322, flood-resistant construction. The city adds R904.5 requiring a minimum Class C roof covering, and a permit lapses if work is not commenced within 90 days of issue.
- The buying intent sits north of here
- The Dallas-Fort Worth DMA runs 14,800 monthly searches for "barndominium" but only 4.0 percent of that volume is the proximity query that signals someone ready to build. The Sherman, Texas-Ada, Oklahoma DMA, which covers Grayson County an hour north of Richardson, runs 8.5 percent on the same measure - more than double.
City of Richardson Code of Ordinances s. 6-31 amending IRC R105.2, and the city's Residential Accessory Building permit page at cor.net
City of Richardson Code of Ordinances, Appendix A, Comprehensive Zoning Ordinance of 1956, Art. IV s. 3(b)
City of Richardson Code of Ordinances, Appendix A, Art. IV s. 4(f)(2), and the city's Residential Accessory Building permit page at cor.net
City of Richardson Code of Ordinances s. 6-31, amended Table R301.2(1) of the 2021 International Residential Code
City of Richardson Building Inspection Department, Contractor Registration page at cor.net
City of Richardson Code of Ordinances s. 6-31, amending the 2021 International Residential Code
Google Ads keyword volumes by Texas DMA, measured for this build 31 August 2026 and recorded in research/texas-keyword-research.md
The expensive surprises are in the ground, not the building
What moves a Texas budget is usually below grade, and it is soil rather than rock: shrink-swell clay. The Blackland Prairie and the Gulf Coast clays move enough between a wet season and a dry one to drive the foundation design across the state's largest markets, which is why several DFW cities require an engineer's seal on the foundation of every new house. Those are the same conditions that decide whether a septic field passes its soil and site evaluation, so the grading plan, the foundation and the drainfield get resolved together rather than one at a time. We price the dirt before we price the building.
What we build in Richardson
All nine of our services — kits, custom plans, post-frame and steel construction, site preparation, permitting and engineering, through to turnkey builds — are available across Dallas County. What a project costs depends far more on the parcel than on square footage, so we work from your land rather than from a rate card.
See what we buildWhat a build looks like
Three stages every Richardson project passes through, from a raw parcel to a finished home. Site work first, because that is where the budget is decided.
The parcel
Zoning, setbacks, flood zone and utility access get checked before anything is drawn.
Pad and permit
Clearing, grading and a compacted pad, while the submittal works through Dallas County.
Frame to finish
Shell erected and dried in, then systems, insulation and interior finish through to CO.
Those are the rules for Dallas County. Tell us what you want to build and we will draw it to them.
Where we build around Richardson
Dallas County and the rural land around it. The buildable acreage for a project this size usually sits outside the city limits, which is frequently what changes who issues your permit.
Keep reading
The questions that usually come next once you know what Richardson allows.
Barndominium Cost Guide
Sourced per-square-foot ranges by tier and by size, with a calculator built on the same figures.
Read itIs It Legal in Texas?
Classification, zoning, the HOA gate, and why "nonresidential farm building" does not cover a home.
Read itHow Long Does It Take?
Census build-duration data, and what actually sets the permit clock where you are building.
Read itNearby areas we build in
Others we cover in this part of Texas. The permitting authority, the adopted design criteria and the zoning can all differ from one to the next.
Building in Richardson: common questions
8 questions we get asked most often about building in Richardson. If yours is not on the list, ask it directly.
Can I build a barndominium in Richardson?
I own a lot in Richardson. What can I actually build?
Does Richardson allow a metal or steel building on a residential lot?
Which climate zone is Richardson in?
Who issues the permit and what does the city require of the builder?
Do I need an engineer for the foundation?
Where should I look for land instead?
Why does this page say no when the rest of the site says yes?
Building in Richardson?
Start with the plan. Tell us what you want to build and we will draw it, then confirm what Dallas County will actually let you put on the parcel and what wind load it has to meet. That conversation costs nothing.